Ok this is where I stand, give the low down...
I have till monday to figure out if I can do the following (since the squirrel people have no respect for appointments they make)
I need to know if I am capable of doing this project without their help...Setting up the entire establishment with the squirrel system that was left from the prior place. Installing the terminals setting up the squirrel box (I would assume this is where the octals are) and configuring the system in a two week period.
I have tremdous ability to learn quickly under pressure. Also know computer quite well. The part that I don't know is the hardware of the squirrel even though I have used it on the front of house side.
I have broken this down into a few parts for futher analysis: 1.) server 2.)squirrel box 3.)cat5 cables 4.)cable-ends 5.)cable junctions 6.) terminals 7.) printers 8.) configure system for opening
This is the best work in squence I can figure. so what do you think can this be done (know it has already) where should I start in my proposal and how much time do you think it would take?
any ideas are appreciated... if you need anything else in terms of information ask I will be monitoring..I HAVE TWO DAYS TO FIGURE THIS OUT!!!
-ability thanks!!!!!
I have till monday to figure out if I can do the following (since the squirrel people have no respect for appointments they make)
I need to know if I am capable of doing this project without their help...Setting up the entire establishment with the squirrel system that was left from the prior place. Installing the terminals setting up the squirrel box (I would assume this is where the octals are) and configuring the system in a two week period.
I have tremdous ability to learn quickly under pressure. Also know computer quite well. The part that I don't know is the hardware of the squirrel even though I have used it on the front of house side.
I have broken this down into a few parts for futher analysis: 1.) server 2.)squirrel box 3.)cat5 cables 4.)cable-ends 5.)cable junctions 6.) terminals 7.) printers 8.) configure system for opening
This is the best work in squence I can figure. so what do you think can this be done (know it has already) where should I start in my proposal and how much time do you think it would take?
any ideas are appreciated... if you need anything else in terms of information ask I will be monitoring..I HAVE TWO DAYS TO FIGURE THIS OUT!!!
-ability thanks!!!!!