I work for a small manufacturing company and one of our products is an electronic control panel.
I have outlined all of the tasks required to complete one panel based on our current production rate. However, we produce 10 of these panels per day. How do show model this in project? Do I manually multiply the duration of each task by 10, in this example, and place this value in the duration field or can Project do this for me? Looking for any suggestions.
Thanks,
LK Williams
I have outlined all of the tasks required to complete one panel based on our current production rate. However, we produce 10 of these panels per day. How do show model this in project? Do I manually multiply the duration of each task by 10, in this example, and place this value in the duration field or can Project do this for me? Looking for any suggestions.