Hi, please, is anybody familiar with using external cost records accounting - records from MSF903 (processed by MSB919) ->into MSF900 (processed by MSB900)-> costs posted onto WO.(We are using just costs not revenue...)...
We have processed 4 months (2 months sucesfully - through both MSB919, MSB900 - 2 months not).One month = in our case is one batch_id.
At the end of running MSB919 remains some records (about 100 records from tousends) from those two batch_id's in MSF903 and MSF903_M_903 (MSF903_A_903 - was deleted first)..
Records posted to MSF900 are not proccessed by MSB900 (No transaction proceseed - I can't find any errors).
What would yould you supposed to do now?
1.With the records in MSF903 etc. (to run it again under another batch_id_)
2.With non processed records in MSF900 (system looks like don't know about them]
3. Is somwhere stored batch_id ? I think that we can't use the same batch number again - bat don't know where is this information stored.
4.What rules schould I check in MSF903...and MSF900
Please, if posible, answer ASAP
Many thanks
Petr
Best regards
Petr
We have processed 4 months (2 months sucesfully - through both MSB919, MSB900 - 2 months not).One month = in our case is one batch_id.
At the end of running MSB919 remains some records (about 100 records from tousends) from those two batch_id's in MSF903 and MSF903_M_903 (MSF903_A_903 - was deleted first)..
Records posted to MSF900 are not proccessed by MSB900 (No transaction proceseed - I can't find any errors).
What would yould you supposed to do now?
1.With the records in MSF903 etc. (to run it again under another batch_id_)
2.With non processed records in MSF900 (system looks like don't know about them]
3. Is somwhere stored batch_id ? I think that we can't use the same batch number again - bat don't know where is this information stored.
4.What rules schould I check in MSF903...and MSF900
Please, if posible, answer ASAP
Many thanks
Petr
Best regards
Petr