I have read others that have this problem. I have put up with it for quite awhile but I just want to know if perhaps 11.5 SP2 may finally fix it. When I was using an older version, you could modify a scheduled job and it would change from incremental to full, but you could modify it back to incremental. That option was lost when I upgraded, and I have put up with it by making changes only on Fridays. I am running 11.5 SP1. Is the problem still there with SP2? If so, they really need to change it back.
Thanks
Thanks