whirlwind5uk
Technical User
Hi All,
I'm after a little advice as a newly trained Mitel 5000 engineer.
I have been asked to upgrade a 2 node Mitel 5200CS site from 2.4 up to the latest revision of 5. The site have Callview, Callview Navigator on site also at software level 4.2. I'm not Callview trained (yet!) but am just trying to clarify if I will need to do anything on the Callview as well. As far as I can tell in the documentation I can get my hands on Callview integrates fine with Mitel 5000 from version 1.x, but as I say, just wanted to confirm. Also, 4.2 appears to be a fairly new revision.
They have a call recorder via Audiolog and Call Popping software also, and I don't think I'll need to touch those either.
The reseller will be getting new flash cards/issuing new licensing for the 5000 upgrade so I think the upgrade of the nodes should be fairly straight forward, with the fall back of putting the old flash cards back in should anything go really wrong.
Any advice you can offer would be really appreciated.
I'm after a little advice as a newly trained Mitel 5000 engineer.
I have been asked to upgrade a 2 node Mitel 5200CS site from 2.4 up to the latest revision of 5. The site have Callview, Callview Navigator on site also at software level 4.2. I'm not Callview trained (yet!) but am just trying to clarify if I will need to do anything on the Callview as well. As far as I can tell in the documentation I can get my hands on Callview integrates fine with Mitel 5000 from version 1.x, but as I say, just wanted to confirm. Also, 4.2 appears to be a fairly new revision.
They have a call recorder via Audiolog and Call Popping software also, and I don't think I'll need to touch those either.
The reseller will be getting new flash cards/issuing new licensing for the 5000 upgrade so I think the upgrade of the nodes should be fairly straight forward, with the fall back of putting the old flash cards back in should anything go really wrong.
Any advice you can offer would be really appreciated.