There are currently seven individual servers that have 10%-20% max CPU utilization on H50’s that are all 332MHz. The breakdown of processors are for the individual servers:
4 servers – 1 CPU (max cpu utilization 20%) ; 512MB memory
2 servers – 2 CPUs (max cpu utilization 20%) ; 1GB & 2 GB memory
1 server – 4 CPUs (max cpu utilization 30%) ; 2 GB memory
The LPARs would be divided among 2 p520s with one server having 3 LPARs and the other p520 running 4 LPARs. Would the p520 have enough capacity to handle the workload above? Disk and network I/O is light. A VIO server is a possibility.
Or would 2 p550’s be better for workload capacity?
4 servers – 1 CPU (max cpu utilization 20%) ; 512MB memory
2 servers – 2 CPUs (max cpu utilization 20%) ; 1GB & 2 GB memory
1 server – 4 CPUs (max cpu utilization 30%) ; 2 GB memory
The LPARs would be divided among 2 p520s with one server having 3 LPARs and the other p520 running 4 LPARs. Would the p520 have enough capacity to handle the workload above? Disk and network I/O is light. A VIO server is a possibility.
Or would 2 p550’s be better for workload capacity?