dragonflygirl
Technical User
I am using ArcServe V9 and have set up custom rotation of a 5 day differential backup with Full backup on Friday. I have an eight slot tape library. I remove the daily tape after the backup has completed and replace it with another tape formatted for that day. Since I am basically using two sets of tapes, can I set up two media pools? And, if I set up two media pools, do I have to go into the job each week and change which pool it is using? Right now I am using one media pool and each day going to assign the tape that I just put in the drive to replace the one that I removed. There has to be a better way. I want to be able to remove the tape, put the other one in and be done. No interaction with the program at all if possible.