I have something strange happening on my Scheduler. I have created and successfully tested a macro to run a report and export to an Excel file. When run manually or from CognosScript Editor, it runs without a hitch. When it is on the Scheduler, the result is 0 rows.
Why would this be? Could it be a timeout issue? The report generally takes between 8-12 minutes to run depending on the number of transactions. The exported file is being saved into a network drive.
I have other macros that do the same thing and work fine.
Thanks for any suggestions.
Saira
Why would this be? Could it be a timeout issue? The report generally takes between 8-12 minutes to run depending on the number of transactions. The exported file is being saved into a network drive.
I have other macros that do the same thing and work fine.
Thanks for any suggestions.
Saira