Hi,
I want to know the method to link 2 project plans.
Project Plan B has about 13 work resources which are also figuring in Project Plan A which has about 30 work Resources.
If I assign work to resources in Plan B, I want to see this assignment in Plan B, in Plan A too.
How can two plans be linked.
Thanks for help
I want to know the method to link 2 project plans.
Project Plan B has about 13 work resources which are also figuring in Project Plan A which has about 30 work Resources.
If I assign work to resources in Plan B, I want to see this assignment in Plan B, in Plan A too.
How can two plans be linked.
Thanks for help