Hello, I am not too familiar with Project, so I will try to be as descriptive as possible.
I have an Excel file linked to a Project document. I need the Project file to have summaries and sub categories. Using a function I wrote Visual Basic in Excel, I have a column that consists of 1s and 2s which designate it's position in the scheduling structure. I cannot, however, link this column from Excel to the Outline Number in Project. Project says that I can't do this because it is automatically calculated. I can manually go in and change it though, so this doesn't make a lot of sense to me.
If you have any recommendations, I would greatly apprecaite them. Thanks.
I have an Excel file linked to a Project document. I need the Project file to have summaries and sub categories. Using a function I wrote Visual Basic in Excel, I have a column that consists of 1s and 2s which designate it's position in the scheduling structure. I cannot, however, link this column from Excel to the Outline Number in Project. Project says that I can't do this because it is automatically calculated. I can manually go in and change it though, so this doesn't make a lot of sense to me.
If you have any recommendations, I would greatly apprecaite them. Thanks.