Wondering if anyone out there can help. I have two schedules in project. both with about 3000 tasks and very similar logic. Both are saved on project server 2003. There has been some issues with moving to Project 2007 and then saving back to 2003, but one of the files is about 4MB and the other is 19MB. This causes problems with emailing the larger file, it gets pushed back from many email servers. Does anyone know why one of the files would be so much larger than the other?