Could someone tell me what I need to install a 3rd 2250 console? Also it is going in a remote buildings - there is a existing 25 pair cable between the buildings now that terms at the idf, can I extend a 25 pair from the IDF to the console or does it have to be a direct pull?
Thanks
Thanks