RicardoPereira
Programmer
Hi,
How do i sum all the information i have until the date filtered in the data dimension?
Example:
2003-01-10 10
2003-05-10 15
2003-06-10 10
2004-04-10 15
2004-05-10 10
2004-08-10 15
2004-09-10 10
What i need is filter the date dimension to the month 8 of 2004 and get the sum of all between 2003-01-10 to 2004-08-10.
Total:75
This is possible?
How do i sum all the information i have until the date filtered in the data dimension?
Example:
2003-01-10 10
2003-05-10 15
2003-06-10 10
2004-04-10 15
2004-05-10 10
2004-08-10 15
2004-09-10 10
What i need is filter the date dimension to the month 8 of 2004 and get the sum of all between 2003-01-10 to 2004-08-10.
Total:75
This is possible?