I have a database called Picture. Picture.rtime is the amount of runtime and has to be /60. and is a charactor field. Picture.shift is numeric and has fields 1 through 6.
Picture.datestamp is datetime field. I am trying to do a fomula for each shift 1,2,3 for each day. Can someone show me how the fomula shoud read.
Thank You Dick
Picture.datestamp is datetime field. I am trying to do a fomula for each shift 1,2,3 for each day. Can someone show me how the fomula shoud read.
Thank You Dick