I try to calculate downtime for machines. I know starting time and ending time for repairing works.
But problem is that there can be multiple repairing works same time for same machine. I should not sum simultaneous repairing times.
Is it possible to make a formula that sums repairing time only once if there is simultaneous repairing works for same machine?