I am using Visio 2002 V10.0.525 and the flowchart, basic shapes . All I am tryign to do is flow out a simple process but I need to know how to show going from one step that will have three things occurring at the same time. Example, an email is sent, something is updated and something is initiated. It looks confusing with three lines coming from one box. Only Visio no linking to outside.