Hi,
I'm using Project Standard 2013. I had one of my projects set to the resource usage view, but discovered that some of the task dates changed when I tried to print it, and did not follow the non-working time set in the project calendar (working days Mon - Fri, with a holiday set for Mon 23rd Dec '13 - Fri 3rd Jan '14). For example, one task had a 10 day duration, and was set to start on Mon 16th Dec; with the holiday this had a finish date of Fri 10th Jan. When I printed it out, it was shown as starting on Sat 28th Dec and finishing on Wed 22nd Jan.
I did a bit of research, and it looks like this problem was addressed with the April 2013 hotfix package. I downloaded the hotfix (64 bit), but when I tried to install it I got the error message "There are no products affected by this package installed on this system".
Can anyone help? The version of Project I have is 15.0.4481.1510 MSO (15.0.4481.1510).
Thanks.
I'm using Project Standard 2013. I had one of my projects set to the resource usage view, but discovered that some of the task dates changed when I tried to print it, and did not follow the non-working time set in the project calendar (working days Mon - Fri, with a holiday set for Mon 23rd Dec '13 - Fri 3rd Jan '14). For example, one task had a 10 day duration, and was set to start on Mon 16th Dec; with the holiday this had a finish date of Fri 10th Jan. When I printed it out, it was shown as starting on Sat 28th Dec and finishing on Wed 22nd Jan.
I did a bit of research, and it looks like this problem was addressed with the April 2013 hotfix package. I downloaded the hotfix (64 bit), but when I tried to install it I got the error message "There are no products affected by this package installed on this system".
Can anyone help? The version of Project I have is 15.0.4481.1510 MSO (15.0.4481.1510).