Hello,
have recently been left in the deep end and am drowning slowly..
am using brightstor r11.1
jobs are set to auto eject the tape after backup completes.
I am not at the host site so unable to reload the tapes.
I am needing to run a test restore first thing after backup completes, but tape auto ejects.
If I go "modify job/options/operation" and change the option to not eject media and then go back to the schedule and recheck the job, the change has not taken effect.
Question is, after changing the eject option, do I need to carry out some other save option or "save the template"?
have recently been left in the deep end and am drowning slowly..
am using brightstor r11.1
jobs are set to auto eject the tape after backup completes.
I am not at the host site so unable to reload the tapes.
I am needing to run a test restore first thing after backup completes, but tape auto ejects.
If I go "modify job/options/operation" and change the option to not eject media and then go back to the schedule and recheck the job, the change has not taken effect.
Question is, after changing the eject option, do I need to carry out some other save option or "save the template"?