i am being asked for a report to show how long it took to solve 90% of jobs.
exampleofdata
jobNo Business Days
3 0.38
4 0.5
2 1.58
7 1.7
1 1.71
5 2.3
9 5.9
10 6.1
6 6.7
8 10.3
average= 2.99
I need to be able to take off the top 10% and work out the average of the 90% is left. The top 10% being the business hours /days.
So job number 8 took the longest and out of the 10 jobs that is the top 10%. So if we remove that and work out the average of the rest the result would be 2.99 Days