I have commited to installing a Norstar CICS system for a friend. I have worked on Nortel systems in the past, but never installed one. The 300 page install manual is a bit much, and was hoping someone could give me the Readers Diagest (condensed) version. I have 6 COs and 6 Stations (5-m7210, 1-m7308). I have an additional 4 port LS/DS card.
I know I need a mounting board and line conditioning/UPS. I also need the 25 pair cables and termination boxes, but don't have any details on this stuff. What else am I missing and any suggestions on manufacturer, models, etc.?
If anyone in Houston - Clear Lake area is available to provide hands on assistance, it would be much appriciated.
Thanks
I know I need a mounting board and line conditioning/UPS. I also need the 25 pair cables and termination boxes, but don't have any details on this stuff. What else am I missing and any suggestions on manufacturer, models, etc.?
If anyone in Houston - Clear Lake area is available to provide hands on assistance, it would be much appriciated.
Thanks