We have a suite of scheduled reports running on a daily and once a month basis which users view daily.

I have been asked to setup a folder to which a static copy of two reports should be saved on the last day of the month.

Is this possible and can anybody tell me how to do this?

Kind Regards,


Mark.
 
Create a shortcut to the reports in the new folder and schedule them to run at end of month.
 
Hi,
If you want a physical copy of the report ( in what format? CR, PDF,..) then set the destination to a file system site using FTP or Unmanaged Disk as the destination of the output ( pre-configure and enable those options first, under the report jobserver tab in the CMC..Servers section.
)