Okay, so I have been researching the best way to go about this upgrade process and have come up with the following upgrade path.
1. Install Netware 6.5 patched on the (Groupwise Server) from scratch
2. Add a replica to the GW server
3. Copy all GW files (PO) and (domain) from the old GW server to the new box
4. In place upgrade 5.5 to 6.5
5. Run DB Maintenance
I after doing a lot of reading on google and Novell's website I still have a few questions.
1. If I install a test server into my tree copy my existing 5.5 files over to the test server and do a practice upgrade am I going to hork up my existing gw system? I want to make sure before doing anything.
2. Have any of you all been successful upgrading GW this way?
3. What should I pay the most attention to while doing this process?
If you have any advice or comments please lemme know. I want this whole process to go as smoothly as possible.
Thanks In Advance.
Tamra Graver --CNA, Network+
*************************************
It is my job to comfort the disturbed
and disturb the comfortable..........
1. Install Netware 6.5 patched on the (Groupwise Server) from scratch
2. Add a replica to the GW server
3. Copy all GW files (PO) and (domain) from the old GW server to the new box
4. In place upgrade 5.5 to 6.5
5. Run DB Maintenance
I after doing a lot of reading on google and Novell's website I still have a few questions.
1. If I install a test server into my tree copy my existing 5.5 files over to the test server and do a practice upgrade am I going to hork up my existing gw system? I want to make sure before doing anything.
2. Have any of you all been successful upgrading GW this way?
3. What should I pay the most attention to while doing this process?
If you have any advice or comments please lemme know. I want this whole process to go as smoothly as possible.
Thanks In Advance.
Tamra Graver --CNA, Network+
*************************************
It is my job to comfort the disturbed