Hi all, i have a list of cash payments which i've grouped in 12 weeks plus one at the end for >12 weeks to show a timeline of cash recieved from start of a job.
i've produced a line graph easy enough but they want two things on there i cant do.
firstly they want a running total across the axis labels for these weeks.
secondly, at the start of a job we have a figure we have to reach, this is stored in the DB and easy to pull out. on the graph then want a verticle line when this is reached.
any ideas?
Using Crystal v10
i've produced a line graph easy enough but they want two things on there i cant do.
firstly they want a running total across the axis labels for these weeks.
secondly, at the start of a job we have a figure we have to reach, this is stored in the DB and easy to pull out. on the graph then want a verticle line when this is reached.
any ideas?