Hey,
Just want to make sure I got the process correct here for replacing hardware on a Server Edition. We are replacing a R230 to a R640 for a large customer.
- Save configuration from the old R230.
- Backup Voicemail Pro
- Load configuration onto new R640
- Restore Voicemail Pro on R640 with the backup from R230
- Rehost license to new server
- Unplug the R230 (this will cause a failover to the Secondary)
- Move Ethernet cables to the new R640
- Wait for everything to come back up (Can even reboot the Secondary to speed up the failover process)
Am I missing anything here?
Thanks
Just want to make sure I got the process correct here for replacing hardware on a Server Edition. We are replacing a R230 to a R640 for a large customer.
- Save configuration from the old R230.
- Backup Voicemail Pro
- Load configuration onto new R640
- Restore Voicemail Pro on R640 with the backup from R230
- Rehost license to new server
- Unplug the R230 (this will cause a failover to the Secondary)
- Move Ethernet cables to the new R640
- Wait for everything to come back up (Can even reboot the Secondary to speed up the failover process)
Am I missing anything here?
Thanks