Hello,
I feel like I'm late to the party doing these upgrades, but the time has finally come.
Think I finally got the correct process down to upgrade the IPO to 11 for one customer.
This is for a different customer that has VMPRO.
This customer is at 9.1.12 for both the IPO & VMPRO, I have the licenses to do the upgrade for both.
After reading numerous other threads about upgrading VMPRO, still not seeing anything cut & dry the best way of doing so.
So far my plan is, do the Backups from System Preferences, then copy the VM folder & file VMData.mdb to both the desktop of the PC running their current VMPRO & to a USB thumb drive.
Then do my IPO upgrade (thinking I might do this remotely)
When that comes back up I'll install my new licenses.
From there I'm not clearly understanding where to go from there with the VMPRO.
Sounds like the VMPRO will see the upgrade license & maybe upgrade itself?
Then I might have to load the VM folder & VMData.mdb file?
Then also restore from System Preferences, from what I backup?
Then all is good after testing???
This almost sounds to easy, so I'm sure I'm missing something.
I know not to upgrade to the 11.1, because of the discontinuation of VMPRO on a windows based PC, out of the 11.0.x, does anyone have their preferences what's the most stable?
Reasoning why doing the upgrade is to add a SCN license on current system, for a new location that the customer purchased & will be installing a new system there.
I currently have Manager 11.0.4.1 Build 11 & was just thinking of using that, so far no issues with new installs using it.
Just upgraded the new system for the new location to that.
Any input would be greatly appreciated.
Thanks
PS, just remembered I also read some say to just do an uninstall of the VMPRO, then load the new version.
What's the opinions of that?
Thanks again & sorry so long
I feel like I'm late to the party doing these upgrades, but the time has finally come.
Think I finally got the correct process down to upgrade the IPO to 11 for one customer.
This is for a different customer that has VMPRO.
This customer is at 9.1.12 for both the IPO & VMPRO, I have the licenses to do the upgrade for both.
After reading numerous other threads about upgrading VMPRO, still not seeing anything cut & dry the best way of doing so.
So far my plan is, do the Backups from System Preferences, then copy the VM folder & file VMData.mdb to both the desktop of the PC running their current VMPRO & to a USB thumb drive.
Then do my IPO upgrade (thinking I might do this remotely)
When that comes back up I'll install my new licenses.
From there I'm not clearly understanding where to go from there with the VMPRO.
Sounds like the VMPRO will see the upgrade license & maybe upgrade itself?
Then I might have to load the VM folder & VMData.mdb file?
Then also restore from System Preferences, from what I backup?
Then all is good after testing???
This almost sounds to easy, so I'm sure I'm missing something.
I know not to upgrade to the 11.1, because of the discontinuation of VMPRO on a windows based PC, out of the 11.0.x, does anyone have their preferences what's the most stable?
Reasoning why doing the upgrade is to add a SCN license on current system, for a new location that the customer purchased & will be installing a new system there.
I currently have Manager 11.0.4.1 Build 11 & was just thinking of using that, so far no issues with new installs using it.
Just upgraded the new system for the new location to that.
Any input would be greatly appreciated.
Thanks
PS, just remembered I also read some say to just do an uninstall of the VMPRO, then load the new version.
What's the opinions of that?
Thanks again & sorry so long