We have NNM 6.4 w/ET with Two Mgmt Station in two locations and 15 CS at remote sites every thing is remotely mgmt, we are using ssh, Exceed to do this. The problem that we are having is with the Extended Topology from the Mgmt station,or workstation it takes about 15 min for Java to load the view, then take another 10 if you drill down on an Object, Do anyone know of a way to speed this process up. Need help.