Aura CM 7.1.3
I have two sites. One runs the main CM procr; the other is the ESS.
The main site is being shut down to replace the main power breaker. I need to failover to the ESS, but don't know how to do that manually.
Can anyone provide the steps to manually failover to the ESS and then go back to the main procr when maintenance is done?
Thanks