This problem appear only on new machines with more than 500 M of RAM or high CPU frequency.
Install last Symposium Client patches from Nortel ESPL library and problem will be solved.
Does it pass the pre-install check and then start loading and do this in the middle of the load? Is it possible that there are "remnants" of an install that are still there. I have had to go into regedit and clear some of those manually to get a good install.
Then the other resort is to load the Sybase portion first, and then the client after you load Sybase.
In my practice similar problem were occured with old version of Sun Jre in Sybase client portion installation.
Do the next:
1) Download Jre update from sybase site (link:
As far as I remember the problem with JRE was on older version of SCCS Client and the reason was Pentium 4 CPU. Be sure that you have SCCS Client Version 4 Revision 7.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.