Does anyone know if it is possible to Dim (not gives users the ability to change) the resource leveling option, and hard-code it? I know where the 0 and 1 is in the registry to toggle between auto and manual, but I want to make this option unavailable to general users. Anyone know if this can be done with a group policy or during the install?
Thanks!
Thanks!