Hello
Im creating a report using topspeed database files as a source (.TPS). The problem im having is that the dates are stored as numbers in the database and when the report generates its doing something to the format. For example 19/11/2003 becomes 72,795. I cant figure out why its doing this at all
Help please
Cheers Croaks
Im creating a report using topspeed database files as a source (.TPS). The problem im having is that the dates are stored as numbers in the database and when the report generates its doing something to the format. For example 19/11/2003 becomes 72,795. I cant figure out why its doing this at all
Help please
Cheers Croaks