Jan 21, 2005 #1 Abhi2379 Programmer Oct 17, 2004 36 HK Hi, Can we update database field through reportnet. Thanks in advance ~jit
Jan 21, 2005 #2 cindyw Technical User Jun 6, 2001 74 US No. You can read the database, but cannot post updates to the database. Upvote 0 Downvote
Jan 21, 2005 Thread starter #3 Abhi2379 Programmer Oct 17, 2004 36 HK Hi, Is there any way to update database one the report is genertaed . I need to update the database field as "Report Generated" = Y in table. Any inputs will be appreciated. TIA ~Jit Upvote 0 Downvote
Hi, Is there any way to update database one the report is genertaed . I need to update the database field as "Report Generated" = Y in table. Any inputs will be appreciated. TIA ~Jit
Jan 24, 2005 #4 cindyw Technical User Jun 6, 2001 74 US Nope, out of the box it is not possible. You could probably develop something though, using a mix of the CRN SDK, a scheduling tool (ex Control M) and a good developer(s). Upvote 0 Downvote
Nope, out of the box it is not possible. You could probably develop something though, using a mix of the CRN SDK, a scheduling tool (ex Control M) and a good developer(s).