I'm assisting in migrating a Crystal reports server XI R2 11.5 installation and reports to a new server, currently the existing installation is running along side the new install on a different server.
The problem I'm experiencing with the new install is when scheduling reports, the report currently alternates from running/pending and cannot be completed.
The following error can be seen in the windows event log:
I have more experience with crystal reports designer than the administrator side, though to debug the problem I compared the settings of the crystal reports servers between the installations.
The Program job and destination server have destinations whereas the Report job server has NONE (See diagram below).
When I schedule the report they are emailed to a number of email addresses, these are not the default email settings I've set up on the program job server which is an option to use in the scheduler, instead I specify the email addresses.
Firstly does the scheduler use the destinations from the reports job server? If so, as mine has no options to use the defaults, how do I add the destinations?
If this is not the issue with the report not running/being stuck in pending mode can anyone advise some steps to resovle this issue.
Thanks Rob
The problem I'm experiencing with the new install is when scheduling reports, the report currently alternates from running/pending and cannot be completed.
The following error can be seen in the windows event log:
I have more experience with crystal reports designer than the administrator side, though to debug the problem I compared the settings of the crystal reports servers between the installations.
The Program job and destination server have destinations whereas the Report job server has NONE (See diagram below).
When I schedule the report they are emailed to a number of email addresses, these are not the default email settings I've set up on the program job server which is an option to use in the scheduler, instead I specify the email addresses.
Firstly does the scheduler use the destinations from the reports job server? If so, as mine has no options to use the defaults, how do I add the destinations?
If this is not the issue with the report not running/being stuck in pending mode can anyone advise some steps to resovle this issue.
Thanks Rob