im workin w/ adobe premiere 6.0.
if i export a movie from the timeline (which took an hour to do), then make small changes on the timeline - i have to re-render the entire damm movie for the full one hour as opposed to the little edit i made.
i hope im wrong...
thx
if i export a movie from the timeline (which took an hour to do), then make small changes on the timeline - i have to re-render the entire damm movie for the full one hour as opposed to the little edit i made.
i hope im wrong...
thx