enbw
Technical User
- Mar 13, 2003
- 296
Hi,
I am fairly new to progress.
We are running an application with uses the progress db 9.1. I have copied a blank database, all the tables and the schema is there. I want to copy tables from from our existing live system, basically master data, into the blank db/tables.
Is there any way to do this? The tables and fields are actually the same, I just want to populate the blank tables with the master data.
Thanks in advance
I am fairly new to progress.
We are running an application with uses the progress db 9.1. I have copied a blank database, all the tables and the schema is there. I want to copy tables from from our existing live system, basically master data, into the blank db/tables.
Is there any way to do this? The tables and fields are actually the same, I just want to populate the blank tables with the master data.
Thanks in advance