Dear all
Hope everything is going well and i'm blessed to join this forum
if you please i had the following scenario and i need your help
we have a customer with existing System:
S8300D
G430
Running on System Platform CM6.0 for 50 Users
The Customer needs a new Location that will have the following platform:
S8300D
G450
Running on CM6 for 200 Users
The Customer needs to Migrate the License of the EXISTING System to the NEW Location and Convert the Old Server to LSP for the EXISTING 50 Users , so the NEW main gatekeeper will control all the calls
can this be Done on Avaya Solution Designer ? is there a simple method to do so ?
some have suggested that I make a new System having the new server
and add a new location with 50 Users LSP and remove the Hardware of the existing location
can you help please ? thank you all
AMR KOPTAN
Hope everything is going well and i'm blessed to join this forum
if you please i had the following scenario and i need your help
we have a customer with existing System:
S8300D
G430
Running on System Platform CM6.0 for 50 Users
The Customer needs a new Location that will have the following platform:
S8300D
G450
Running on CM6 for 200 Users
The Customer needs to Migrate the License of the EXISTING System to the NEW Location and Convert the Old Server to LSP for the EXISTING 50 Users , so the NEW main gatekeeper will control all the calls
can this be Done on Avaya Solution Designer ? is there a simple method to do so ?
some have suggested that I make a new System having the new server
and add a new location with 50 Users LSP and remove the Hardware of the existing location
can you help please ? thank you all