Hi Guys! Can you help on this?
I have a site_1 that has a Duplex CM and 2 G450 in site_2 I have a ESS and a G450. Should I put the ESS PE into MGC list?
If YES, after the main server is cut from the network, the G450 will register with ESS and it takes over.
I want to manually coordinate the Failover and return back to the Main.
I have a site_1 that has a Duplex CM and 2 G450 in site_2 I have a ESS and a G450. Should I put the ESS PE into MGC list?
If YES, after the main server is cut from the network, the G450 will register with ESS and it takes over.
I want to manually coordinate the Failover and return back to the Main.