Aug 7, 2018 #1 Mahiroux Systems Engineer Aug 7, 2018 1 AE Is it possible to increase the maximum duration of call reports to more than 7 days in Prime Collaboration Assurance 11.6
Is it possible to increase the maximum duration of call reports to more than 7 days in Prime Collaboration Assurance 11.6
Sep 20, 2018 #2 ReallyRotten MIS Mar 11, 2004 362 CA Hi - no you can't. I have the same issue. If you want more than 7 days you will need to go to the CAR tool. Upvote 0 Downvote
Hi - no you can't. I have the same issue. If you want more than 7 days you will need to go to the CAR tool.