Dexmex
IS-IT--Management
- Apr 17, 2010
- 5
I've bumped into a problem with a staff member having to work over nights into the morning (11pm-7am).
Because of all the things the server does with the database I was hoping there is a way to start all the End Of Day Sequences at a later time in the morning.
Is this possible or is there another way to make sure the system doesn't mess with the employees open chks?
Thanks in advance for the help.
Dexter
Because of all the things the server does with the database I was hoping there is a way to start all the End Of Day Sequences at a later time in the morning.
Is this possible or is there another way to make sure the system doesn't mess with the employees open chks?
Thanks in advance for the help.
Dexter