Every time i make any change to a report that has been saved to infoview(BOE) I have to go to REPORT>PROCESS>DATABASE and give the password and update it. Is there a way to avoid having to do this everytime I make any change to the reports.

Thanks in advance.
 
Go to the CMC and locate each report object.
On the Properties tab, there is a link for "Refresh Options".
Turn off the Checkbox for "Default Database Logon Information"
If you want to do this in bulk, check out "Object Manager" from APOS Systems ( It allows you to manage a ton of information about report objects, users, security, etc.

Bob Suruncle
 
When you open a report in CR using the address as displayed on the properties tab, just below the report name (e.g.: frs://Input/a_141/219/001/121741/151445c05087b26.rpt) you can modify almost everything you want and save the changed report without having to reset the database logon information.

Jeroen.
 
read the post 'Do I need to reschedule a report when it's modified???' first, it's a good explenation.
 