Hi everybody,
I have a report with 2 parameters (from date / to date). In CE10 I have no problem to view the report or to schedule the report to "Crystal format". BUT when I schedule it to an excel-file (or pdf, text, ...) I get an empty sheet. The problem must be the date-parameters - if I run the report without the parameters the export works fine and the excel-sheet is loaded with data. By activating the parameters the export delivers a empty sheet (word-doc, text-file, pdf, ..) - every kind of export fails. We are working with Oracle 9 and we used the native connection to the database.
Any hints or help ????
Thanks.
I have a report with 2 parameters (from date / to date). In CE10 I have no problem to view the report or to schedule the report to "Crystal format". BUT when I schedule it to an excel-file (or pdf, text, ...) I get an empty sheet. The problem must be the date-parameters - if I run the report without the parameters the export works fine and the excel-sheet is loaded with data. By activating the parameters the export delivers a empty sheet (word-doc, text-file, pdf, ..) - every kind of export fails. We are working with Oracle 9 and we used the native connection to the database.
Any hints or help ????
Thanks.