Can anybody give me some advice on where I may be going wrong with this as its frustrating me somewhat.
I've just installed two CAT6 Right angle patch panels with an 18M CAT6 link x 4 between them, all using the same brand of hardware (Excel)
The cabling was installed very carefully and has suffered no snags / kinks or other damage, although cabling was pulled in rather than being laid it was done very gently.
All four of the links fail due to high next between 36-12
I took plenty of time on the terminations and have maintained the twist right up until the point of termination with a minimal amount taken from the outer jacket.
Please note that I am not a pro cable installer, nor am I doing this work for money, its for a friend on a non-commercial premises.
Can anybody give me some advice on where I may be going wrong with this as its frustrating me somewhat.
I've just installed two CAT6 Right angle patch panels with an 18M CAT6 link x 4 between them, all using the same brand of hardware (Excel)
The cabling was installed very carefully and has suffered no snags / kinks or other damage, although cabling was pulled in rather than being laid it was done very gently.
All four of the links fail due to high next between 36-12
I took plenty of time on the terminations and have maintained the twist right up until the point of termination with a minimal amount taken from the outer jacket.
Please note that I am not a pro cable installer, nor am I doing this work for money, its for a friend on a non-commercial premises.