Nzarth
Technical User
- Oct 29, 2003
- 184
On a Friday I want to do a complete backup job on one tape (say SQL and Exchange backup). Then on Saturday I want to do another complete backup job (say File shares, etc).
Then between Monday and Thursday, would like to do Incremental backups for both jobs on one tape (would have enough space on tape).
Was thinking say start one at 8pm and the other at 12am (should be enough time).
Using Veritas 8.6.
Thanks in advance.
Nzarth
MCSA/MCSE (W2K), CCA
Working on CCNA
Then between Monday and Thursday, would like to do Incremental backups for both jobs on one tape (would have enough space on tape).
Was thinking say start one at 8pm and the other at 12am (should be enough time).
Using Veritas 8.6.
Thanks in advance.
Nzarth
MCSA/MCSE (W2K), CCA
Working on CCNA