JohnWantsToKnow
Programmer
I'm looking for a method of calculating the time taken to generate a report in crystal 8.5. I have tried putting a formula for currentdatetime in the report header and in the footer then trying to subtract them. Results leave a lot to be desired. Does anyone know of a quick method of getting an accurate time taken for a report to generate?
T.I.A
John.
T.I.A
John.