Hi,
We are currently running Brightstor Arcserve 11.1 (Build 3200) on a Windows 2003 server machine. It is set up to back up itself and two remote servers. The backup job runs a full backup each Monday - Friday night and backs up to an HP Storageworks Ultrium 215 LTO drive (one tape). We have a two week rotation of tapes.
For some reason, in the last month or so, every Monday night the backup asks for a second tape. The rest of the week runs fine - only on Monday nights does this happen. I have checked, and the same amount of data is being backed up each night. We have changed out both Monday tapes, but it still occurs.
This particular backup takes about 12 hours to complete normally, and the tape is usually asked for on the last remote server to be backed up, so by the time we notice it needs a tape, the backup times out and the job fails on the last target.
Any ideas on why this would happen, and only one night a week?
Thanks in advance for any insight!
Tara
We are currently running Brightstor Arcserve 11.1 (Build 3200) on a Windows 2003 server machine. It is set up to back up itself and two remote servers. The backup job runs a full backup each Monday - Friday night and backs up to an HP Storageworks Ultrium 215 LTO drive (one tape). We have a two week rotation of tapes.
For some reason, in the last month or so, every Monday night the backup asks for a second tape. The rest of the week runs fine - only on Monday nights does this happen. I have checked, and the same amount of data is being backed up each night. We have changed out both Monday tapes, but it still occurs.
This particular backup takes about 12 hours to complete normally, and the tape is usually asked for on the last remote server to be backed up, so by the time we notice it needs a tape, the backup times out and the job fails on the last target.
Any ideas on why this would happen, and only one night a week?
Thanks in advance for any insight!
Tara