Hello
I have the following problem.
I have a group which is scheduled to run every Friday.
The other days are skipped. Now the backup of the clients
are skipped but Legato wants to save the bootstrap.
Is there a way to tell Legato that the save of the bootstrap
has to be skipped also
Thanks
Koenraad.Bohyn@switch.be
I have the following problem.
I have a group which is scheduled to run every Friday.
The other days are skipped. Now the backup of the clients
are skipped but Legato wants to save the bootstrap.
Is there a way to tell Legato that the save of the bootstrap
has to be skipped also
Thanks
Koenraad.Bohyn@switch.be