Hi all,
Is it possible to configure BE 10 in a way that when I configure a B2D Job and a copy ToTape Job after that, the Copy Job does not start immediatly after the Disk_job but for example two hours later or at a special time?
If it is possible, how can I do that.
Thanks in advance
/egr
Is it possible to configure BE 10 in a way that when I configure a B2D Job and a copy ToTape Job after that, the Copy Job does not start immediatly after the Disk_job but for example two hours later or at a special time?
If it is possible, how can I do that.
Thanks in advance
/egr