I have a backup job that ends/cancels itself at about 62GB of data. I'm using 80GB compressed DLT for media. Also, that last session that gets cut off by the job is only 10GB, so the total size of the job is 72GB, still plenty of room left on the media.
I have other jobs that run over 70gb with no issues. I have tried tweaking some things here and there, but still the job dies just over 60gb.
H-E-L-P!
Carpe diem, procrastination is the thief of time...
I have other jobs that run over 70gb with no issues. I have tried tweaking some things here and there, but still the job dies just over 60gb.
H-E-L-P!
Carpe diem, procrastination is the thief of time...