Hi All,
I am using Arcserve 2000 AE on a Win2000 Adv Server. When I schedule a Job to run the status of the job goes from "READY" straight to "DONE" without backing up anything.
There are NO messages logged in the Activity Log to indicate that the Job ran. I have also tried:
- Stopping the Job Engine
- Renaming the 0000001.qsd Folder to 0000001.qsd.OLD
- Restarting the Job Engine (new .qsd folder was created)
- Creating a new Scheduled backup job
This has the same results. The job changes its status to "Done" as soon as the scheduled execution time is reached.
I have also checked to see if a "dbclean.exe" process is running (as recommended in another post on this site) and it is not running. Scheduled database prune jobs still run correctly.
Thanks in advance.
Marty
I am using Arcserve 2000 AE on a Win2000 Adv Server. When I schedule a Job to run the status of the job goes from "READY" straight to "DONE" without backing up anything.
There are NO messages logged in the Activity Log to indicate that the Job ran. I have also tried:
- Stopping the Job Engine
- Renaming the 0000001.qsd Folder to 0000001.qsd.OLD
- Restarting the Job Engine (new .qsd folder was created)
- Creating a new Scheduled backup job
This has the same results. The job changes its status to "Done" as soon as the scheduled execution time is reached.
I have also checked to see if a "dbclean.exe" process is running (as recommended in another post on this site) and it is not running. Scheduled database prune jobs still run correctly.
Thanks in advance.
Marty