I am running Backup Exec 8.6 Small Business Server Edition on a Win2k SB Server. I have dual 2.4 Ghz processors, and 2 Gig of RAM. My problem lies in the fact that scheduled jobs hang in the "Loading Job" state and never complete, and seems to hang on the media mount. they end up having to be cancelled by an Admin as the log states here:
======================================================================
Job server: APPSERVER
Job name: Shingle Backup
Job started: Friday, June 06, 2003 at 10:00:01 PM
Job type: Backup
Job Log: BEX27.txt
======================================================================
Error - Mount failed.
^ ^ ^ ^ ^
User canceled a Physical Volume Library operation.
======================================================================
Job ended: Sunday, June 08, 2003 at 3:29:26 PM
Job completion status: Canceled by APPSERVER\administrator
======================================================================
However when I use the exact same job definitions and run the job manually I get a successful backup. The problem seems to be in the scheduling but I am unsure where to start with this. I need some assistance, possibley just a point in the right direction for me to look at in order to make some tweaks. Several floks on this board have been so very helpful in the past which is why I am posting this here. Send any inquiries to styszka@beringer.net
Stan
======================================================================
Job server: APPSERVER
Job name: Shingle Backup
Job started: Friday, June 06, 2003 at 10:00:01 PM
Job type: Backup
Job Log: BEX27.txt
======================================================================
Error - Mount failed.
^ ^ ^ ^ ^
User canceled a Physical Volume Library operation.
======================================================================
Job ended: Sunday, June 08, 2003 at 3:29:26 PM
Job completion status: Canceled by APPSERVER\administrator
======================================================================
However when I use the exact same job definitions and run the job manually I get a successful backup. The problem seems to be in the scheduling but I am unsure where to start with this. I need some assistance, possibley just a point in the right direction for me to look at in order to make some tweaks. Several floks on this board have been so very helpful in the past which is why I am posting this here. Send any inquiries to styszka@beringer.net
Stan