Please help!
We've been receiving the following error when our AS/400 IPL's:
'The required AS/400 NetServer job QZLSSERVER wa unable to start because of reason code 6.'
Reason Code 6 = Start of the internal server failed with return code 3409.
Apparently, there is a problem when the system tries to start NetServer which causes the system to lock-up.
We've been looking for the proper PTF to correct the problem, but there doesn't seem to be one that focuses on this problem.
Any suggestions?
dareseka
We've been receiving the following error when our AS/400 IPL's:
'The required AS/400 NetServer job QZLSSERVER wa unable to start because of reason code 6.'
Reason Code 6 = Start of the internal server failed with return code 3409.
Apparently, there is a problem when the system tries to start NetServer which causes the system to lock-up.
We've been looking for the proper PTF to correct the problem, but there doesn't seem to be one that focuses on this problem.
Any suggestions?
dareseka